Glossary entry (derived from question below)
English term or phrase:
GRID FREQUENCY CONTROL (AND CIRCUIT)
Croatian translation:
upravljanje mrežnom frekvencijom / frekvencijom mreže (i strujnim krugom)
Added to glossary by
LogosART
Jul 22, 2015 19:37
8 yrs ago
3 viewers *
English term
GRID FREQUENCY CONTROL (AND CIRCUIT)
English to Croatian
Tech/Engineering
Engineering: Industrial
XIII. GRID FREQUENCY CONTROL (GFC) WITH WATER WASH INJECTION (APPLIES TO UNITS WITH GFC REQUIREMENTS ONLY)
Several grid codes specify that at specific frequencies below normal, such as 50 Hz, gas turbine should remain at base load. During a severe under-frequency event, water wash injection may be used to reduce the net over firing of the gas turbine to conserve hot section life. The use of water wash injection to comply with GFC requirements depends on local regulation.
If water wash is used with GFC requirement, a GFC circuit is installed parallel to the on-line wash circuit so that both circuits are supplied simultaneously by the water wash skid. During a severe under-frequency event, two control valves are commanded open, water wash pump starts and water flows through both the on-line wash circuit and GFC circuit for a specified time duration. To maximize system reliability, a self-test of the GFC circuit is performed for a few seconds every ten on-line compressor wash sequence.
Several grid codes specify that at specific frequencies below normal, such as 50 Hz, gas turbine should remain at base load. During a severe under-frequency event, water wash injection may be used to reduce the net over firing of the gas turbine to conserve hot section life. The use of water wash injection to comply with GFC requirements depends on local regulation.
If water wash is used with GFC requirement, a GFC circuit is installed parallel to the on-line wash circuit so that both circuits are supplied simultaneously by the water wash skid. During a severe under-frequency event, two control valves are commanded open, water wash pump starts and water flows through both the on-line wash circuit and GFC circuit for a specified time duration. To maximize system reliability, a self-test of the GFC circuit is performed for a few seconds every ten on-line compressor wash sequence.
Proposed translations
(Croatian)
4 | upravljanje mrežnom frekvencijom / frekvencijom mreže (i strujnim krugom) | LogosART |
Change log
Jul 29, 2015 15:03: LogosART Created KOG entry
Proposed translations
23 hrs
Selected
upravljanje mrežnom frekvencijom / frekvencijom mreže (i strujnim krugom)
upravljanje mrežnom frekvencijom / frekvencijom mreže (i strujnim krugom)
Note from asker:
Hvala!! :) |
4 KudoZ points awarded for this answer.
Something went wrong...